Design Process #4: Knitting…

Step 4 of designing in this series is just knitting. Knitting, adjusting my draft pattern, adjusting numbers if necessary. Trying the sweater on now and again to make sure it is all as it should be.

Most of the adjusting and trying on happens when working the yoke. I’m trying it on several times to see if it works. Once I’ve divided for sleeves, the process is smooth sailing from here – the rest of the body is just knitting and knitting, spruced up with some waist shaping and the color changes. I take meticulous notes on the yarn usage for each color, to check if the calculations I made on color use actually work out or not.

In this particular case, it looks like the calculations were on the generous side, which is good. I might need to adjust it a little bit for the final pattern, as the calculations were very generous, but I’m happy that I indeed have enough yarn and did the calculations right so I am sure not to run out. Phew! If it turns out I don’t have enough yarn, it’s a huge turn off and the project risks being thrown in a corner to think about what it has done ;)

Some decisions have to be made at this point as well. And, actually, one of the inklings I had regarding the yarn, which I had ignored for the sake of ease, proves right. I will in no way have enough of the last, dark blue, to make the sleeves the full length I wanted them to be. As the sleeves are around 10 cm longer than the body, I would need double the amount of the darkest yarn for the sleeves to make that length. And I don’t have that, as I worked the required stripe length + the ribbing in that color.

What to do? The project gets to hibernate a little bit while I contemplate whether I should do something fun with the yarn left overs in other colors, or just stop the sleeves after the second to last color and work a ribbing for 3/4 or bracelet length sleeves. Tough decision here.

 

Next up: Step 5: Taking a final decision, blocking, and sending the pattern off for tech editing.